Due to the trend of electric cost increase, the cost of smelting process has been increasing as well. To contribute to save this energy and cost, we believe our pre-heating device is effective.
Also, various layout can be available by combining with our material charging system.
We contribute optimize your facility.
Features of this product
Catalog Download(PDF)
At present, there is no released information.